Proposed New Monitoring Plan | 3/27/2004 | |||||||||||
Remaining ten sites (orange circles): | ||||||||||||
Assumes that LOX 1 & 2 will be sampled | ||||||||||||
Two co-located with Z transect | ||||||||||||
Other placed to fill in gaps around perimeter (about 1 km in) | ||||||||||||
Note: should these be moved to 0.5 km? | ||||||||||||
There is still a hole in the southwest interior, could move one of the transect sites there | ||||||||||||
or move Site Lox-2 there since it is close enough to transect | ||||||||||||
|
||||||||||||