Calibration Charts Case = STA6_NULL ,  Cell  =  NULL 06/01/05
Network Simulation        
Simulation Period 12/01/97 01/24/05 Combined Outflow from STA6      
Output Period: 12/01/97 01/24/05              
Calibration Period: 07/01/00 01/24/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth #N/A cm K 0.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm #N/A C0 0.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load #N/A cm/d C1 0 ppb Count 0 49 49 48 48 48
Mean P Load #N/A mg/m2-yr C2 0 ppb Observed #N/A #N/A #N/A 21.3 18.1 #N/A 0.85
Mean Flow/Width #N/A m2/day Z1 0 cm Predicted #N/A #N/A #N/A 25.0 20.5 #N/A 0.82
Hydraulic Resid Time #N/A days Z2 0 cm Mean Resid #N/A #N/A #N/A -3.7 -2.5 #N/A 0.03
Inflow Conc #N/A ppb Z3 0 cm Bias % #N/A #N/A #N/A -15% -12% #N/A 3%
FWM Outflow Conc 25 ppb Avg Int 30 days Residual SE% #N/A 47% 46% 89% 42% 42%
GeoMn Outflow Conc 21 ppb Area 0 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed