Calibration Charts Case = STA5_NULL ,  Cell  =  OUTLET 06/01/05
STA5 Cells in parallel        
Simulation Period 06/01/99 02/28/05 Network simulation output        
Output Period: 06/01/99 02/28/05              
Calibration Period: 09/01/03 02/28/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth #N/A cm K 0.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm #N/A C0 0.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load #N/A cm/d C1 0 ppb Count 0 19 19 19 19 19
Mean P Load #N/A mg/m2-yr C2 0 ppb Observed #N/A #N/A #N/A 212.1 107.0 #N/A 0.50
Mean Flow/Width #N/A m2/day Z1 0 cm Predicted #N/A #N/A #N/A 89.0 84.6 #N/A 0.95
Hydraulic Resid Time #N/A days Z2 0 cm Mean Resid #N/A #N/A #N/A 123.2 22.4 #N/A -0.45
Inflow Conc #N/A ppb Z3 0 cm Bias % #N/A #N/A #N/A 138% 27% #N/A -47%
FWM Outflow Conc 89 ppb Avg Int 30 days Residual SE% #N/A 9% 9% 62% 54% 54%
GeoMn Outflow Conc 85 ppb Area 0 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed