Calibration Charts Case = STA5_C2AB ,  Cell  =  2B 06/01/05
STA5 Cells 2A & 2B        
Simulation Period 06/01/99 02/28/05 Includes Measured Seepage Return at Inflow  
Output Period: 06/01/99 02/28/05              
Calibration Period: 09/01/03 02/28/05              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 34 cm K 16.8 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 5% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 3.4 cm/d C1 22 ppb Count 19 19 19 17 17 17
Mean P Load 2572 mg/m2-yr C2 300 ppb Observed 36.9 2.5 3.36 134.0 104.3 111.7 0.78
Mean Flow/Width 109 m2/day Z1 40 cm Predicted 33.7 2.9 3.22 109.1 116.2 223.7 1.06
Hydraulic Resid Time 10 days Z2 100 cm Mean Resid 3.2 -0.4 0.14 24.9 -11.9 -112.0 -0.29
Inflow Conc 205 ppb Z3 200 cm Bias % 9% -15% 4% 23% -10% -50% -27%
FWM Outflow Conc 109 ppb Avg Int 30 days Residual SE% 46% 39% 39% 315% 45% 45%
GeoMn Outflow Conc 116 ppb Area 4.937 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed