Calibration Charts Case = STA5_C1AB ,  Cell  =  C1B 06/01/05
STA5 Cells 1A & 1B in series      
Simulation Period 06/01/99 02/28/05 inflows include measured seepage return    
Output Period: 06/01/99 02/28/05              
Calibration Period: 09/01/03 01/31/05              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 53 cm K 16.8 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 6.1 cm/d C1 22 ppb Count 19 19 19 19 19 19
Mean P Load 2721 mg/m2-yr C2 300 ppb Observed 52.4 5.9 4.22 71.5 72.9 71.1 1.02
Mean Flow/Width 194 m2/day Z1 40 cm Predicted 53.1 5.7 4.45 78.5 73.0 71.7 0.93
Hydraulic Resid Time 9 days Z2 100 cm Mean Resid -0.8 0.2 -0.23 -7.0 -0.1 -0.6 0.09
Inflow Conc 122 ppb Z3 200 cm Bias % -1% 4% -5% -9% 0% -1% 10%
FWM Outflow Conc 78 ppb Avg Int 30 days Residual SE% 32% 26% 26% 175% 34% 34%
GeoMn Outflow Conc 73 ppb Area 4.937 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed