Calibration Charts Case = STA5_C1AB ,  Cell  =  C1A 06/01/05
STA5 Cells 1A & 1B in series      
Simulation Period 06/01/99 02/28/05 inflows include measured seepage return    
Output Period: 06/01/99 02/28/05              
Calibration Period: 09/01/03 01/31/05              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 48 cm K 16.8 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 9.3 cm/d C1 22 ppb Count 19 0 0 0 0 0
Mean P Load 4953 mg/m2-yr C2 300 ppb Observed 52.6 #N/A #N/A #N/A #N/A #N/A #N/A
Mean Flow/Width 202 m2/day Z1 40 cm Predicted 48.3 #N/A #N/A #N/A #N/A #N/A #N/A
Hydraulic Resid Time 5 days Z2 100 cm Mean Resid 4.3 #N/A #N/A #N/A #N/A #N/A #N/A
Inflow Conc 146 ppb Z3 200 cm Bias % 9% #N/A #N/A #N/A #N/A #N/A #N/A
FWM Outflow Conc #N/A ppb Avg Int 30 days Residual SE% 11% #N/A #N/A #N/A #N/A #N/A
GeoMn Outflow Conc #N/A ppb Area 3.379 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed