Calibration Charts Case = STA34_C2AB ,  Cell  =  2A 06/01/05
STA34 Cells 2A & 2B        
Simulation Period 10/01/03 03/31/05 Cell 2B in SAV          
Output Period: 10/01/03 03/31/05              
Calibration Period: 04/01/04 03/31/05              
Predicted Values for Calibration Period Calibration Set: PEW_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 48 cm K 34.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 8% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 5.1 cm/d C1 22 ppb Count 10 0 0 0 0 0
Mean P Load 1659 mg/m2-yr C2 300 ppb Observed 52.6 #N/A #N/A #N/A #N/A #N/A #N/A
Mean Flow/Width 183 m2/day Z1 40 cm Predicted 67.3 #N/A #N/A #N/A #N/A #N/A #N/A
Hydraulic Resid Time 9 days Z2 100 cm Mean Resid -14.7 #N/A #N/A #N/A #N/A #N/A #N/A
Inflow Conc 88 ppb Z3 200 cm Bias % -22% #N/A #N/A #N/A #N/A #N/A #N/A
FWM Outflow Conc #N/A ppb Avg Int 7 days Residual SE% 29% #N/A #N/A #N/A #N/A #N/A
GeoMn Outflow Conc #N/A ppb Area 10.287 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed