Calibration Charts Case = STA2_NULL ,  Cell  =  OUTFLOW 06/01/05
Combined outflow from STA2 Network simulation  
Simulation Period 03/01/01 03/24/05 Cells 1, 2,3 in parallel        
Output Period: 03/01/01 03/24/05              
Calibration Period: 05/01/03 03/24/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth #N/A cm K 0.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm #N/A C0 0.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load #N/A cm/d C1 0 ppb Count 0 24 24 24 24 24
Mean P Load #N/A mg/m2-yr C2 0 ppb Observed #N/A #N/A #N/A 16.4 13.6 #N/A 0.83
Mean Flow/Width #N/A m2/day Z1 0 cm Predicted #N/A #N/A #N/A 24.6 15.5 #N/A 0.63
Hydraulic Resid Time #N/A days Z2 0 cm Mean Resid #N/A #N/A #N/A -8.2 -2.0 #N/A 0.20
Inflow Conc #N/A ppb Z3 0 cm Bias % #N/A #N/A #N/A -33% -13% #N/A 31%
FWM Outflow Conc 25 ppb Avg Int 30 days Residual SE% #N/A 21% 21% 53% 44% 44%
GeoMn Outflow Conc 16 ppb Area 0 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed