Calibration Charts Case = STA1W_NULL ,  Cell  =  NODE 06/01/05
Whole STA1W          
Simulation Period 08/01/94 03/31/05 inflow fractions calibrated to observed flows    
Output Period: 01/01/95 03/31/05 seepage recycle ignored        
Calibration Period: 07/01/00 08/31/04              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth #N/A cm K 0.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm #N/A C0 0.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load #N/A cm/d C1 0 ppb Count 0 52 52 48 48 48
Mean P Load #N/A mg/m2-yr C2 0 ppb Observed #N/A #N/A #N/A 46.8 37.5 #N/A 0.80
Mean Flow/Width #N/A m2/day Z1 0 cm Predicted #N/A #N/A #N/A 49.6 36.2 #N/A 0.73
Hydraulic Resid Time #N/A days Z2 0 cm Mean Resid #N/A #N/A #N/A -2.8 1.3 #N/A 0.07
Inflow Conc #N/A ppb Z3 0 cm Bias % #N/A #N/A #N/A -6% 4% #N/A 10%
FWM Outflow Conc 50 ppb Avg Int 30 days Residual SE% #N/A 18% 18% 95% 32% 32%
GeoMn Outflow Conc 36 ppb Area 0 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed