Calibration Charts Case = STA1W_C24 ,  Cell  =  C4 06/01/05
STA1W - Cell 2 & 4 in series      
Simulation Period 08/01/94 03/31/05 G254 flows reduced by 20% after 2001 to close water budget (problems with UVM flow data)
Output Period: 01/01/00 03/31/05              
Calibration Period: 07/01/00 08/31/04              
Predicted Values for Calibration Period Calibration Set: SAV_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 60 cm K 52.5 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 8% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 17.5 cm/d C1 22 ppb Count 51 51 51 51 51 51
Mean P Load 5888 mg/m2-yr C2 300 ppb Observed 66.4 17.2 9.76 56.8 37.1 35.7 0.65
Mean Flow/Width 297 m2/day Z1 40 cm Predicted 60.5 16.9 9.64 56.9 42.2 51.8 0.74
Hydraulic Resid Time 3 days Z2 100 cm Mean Resid 5.9 0.3 0.12 -0.1 -5.1 -16.1 -0.09
Inflow Conc 92 ppb Z3 200 cm Bias % 10% 2% 1% 0% -12% -31% -12%
FWM Outflow Conc 57 ppb Avg Int 30 days Residual SE% 35% 33% 33% 74% 29% 29%
GeoMn Outflow Conc 42 ppb Area 1.45 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed