Calibration Charts Case = STA1W_C13 ,  Cell  =  C1 06/01/05
STA1W - Cell 1 & 3 ; inflows include measured seepage return
Simulation Period 08/01/94 03/31/05              
Output Period: 01/01/00 03/31/05              
Calibration Period: 07/01/00 08/31/04              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 59 cm K 16.8 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.6 cm/d C1 22 ppb Count 51 51 51 51 51 51
Mean P Load 2347 mg/m2-yr C2 300 ppb Observed 66.3 4.6 2.66 57.9 50.2 53.2 0.87
Mean Flow/Width 210 m2/day Z1 40 cm Predicted 58.9 4.0 2.64 65.5 57.6 57.7 0.88
Hydraulic Resid Time 13 days Z2 100 cm Mean Resid 7.3 0.6 0.03 -7.6 -7.5 -4.5 -0.01
Inflow Conc 140 ppb Z3 200 cm Bias % 12% 14% 1% -12% -13% -8% -2%
FWM Outflow Conc 65 ppb Avg Int 30 days Residual SE% 22% 48% 48% 82% 38% 38%
GeoMn Outflow Conc 58 ppb Area 6.03 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed