Calibration Charts Case = ENRP_C24 ,  Cell  =  C4 06/01/05
ENRP Cells 2 & 4 in Series      
Simulation Period 08/01/94 12/31/98 Prior to STA1W Construction      
Output Period: 08/01/94 12/31/98              
Calibration Period: 01/01/97 12/31/98              
Predicted Values for Calibration Period Calibration Set: SAV_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 66 cm K 52.5 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 12.6 cm/d C1 22 ppb Count 25 25 25 25 25 25
Mean P Load 1899 mg/m2-yr C2 300 ppb Observed 62.8 11.2 1.92 17.2 16.6 16.4 0.97
Mean Flow/Width 215 m2/day Z1 40 cm Predicted 66.0 12.1 2.49 20.5 20.4 20.0 0.99
Hydraulic Resid Time 5 days Z2 100 cm Mean Resid -3.2 -1.0 -0.58 -3.4 -3.8 -3.5 -0.02
Inflow Conc 41 ppb Z3 200 cm Bias % -5% -8% -23% -16% -18% -18% -2%
FWM Outflow Conc 21 ppb Avg Int 30 days Residual SE% 12% 16% 16% 48% 36% 36%
GeoMn Outflow Conc 20 ppb Area 1.45 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed