Calibration Charts Case = ENRP_C13 ,  Cell  =  C3 06/01/05
ENRP Cells 1 & 3 in series      
Simulation Period 08/01/94 12/31/98 Prior to STA1W construction      
Output Period: 08/01/94 12/31/98 Inflows include measured seepage return    
Calibration Period: 01/01/97 12/31/98              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 31 cm K 16.8 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 3.4 cm/d C1 22 ppb Count 25 25 25 25 25 25
Mean P Load 493 mg/m2-yr C2 300 ppb Observed 30.4 3.0 0.62 20.7 19.3 19.2 0.93
Mean Flow/Width 104 m2/day Z1 40 cm Predicted 31.0 3.0 0.73 24.1 24.3 24.9 1.01
Hydraulic Resid Time 9 days Z2 100 cm Mean Resid -0.6 -0.1 -0.11 -3.3 -5.0 -5.7 -0.08
Inflow Conc 40 ppb Z3 200 cm Bias % -2% -2% -16% -14% -20% -23% -8%
FWM Outflow Conc 24 ppb Avg Int 30 days Residual SE% 23% 41% 41% 56% 33% 33%
GeoMn Outflow Conc 24 ppb Area 4.15 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed