Calibration Charts Case = ENRP_C13 ,  Cell  =  C1 06/01/05
ENRP Cells 1 & 3 in series      
Simulation Period 08/01/94 12/31/98 Prior to STA1W construction      
Output Period: 08/01/94 12/31/98 Inflows include measured seepage return    
Calibration Period: 01/01/97 12/31/98              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 54 cm K 16.8 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 2.9 cm/d C1 22 ppb Count 25 25 25 25 25 25
Mean P Load 946 mg/m2-yr C2 300 ppb Observed 49.9 1.9 0.72 38.7 39.5 39.6 1.02
Mean Flow/Width 133 m2/day Z1 40 cm Predicted 54.2 2.3 0.93 40.0 38.2 37.4 0.96
Hydraulic Resid Time 19 days Z2 100 cm Mean Resid -4.2 -0.5 -0.21 -1.3 1.3 2.2 0.07
Inflow Conc 89 ppb Z3 200 cm Bias % -8% -20% -22% -3% 3% 6% 7%
FWM Outflow Conc 40 ppb Avg Int 30 days Residual SE% 12% 39% 39% 47% 38% 38%
GeoMn Outflow Conc 38 ppb Area 6.03 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed