Calibration Charts Case = WCA2A_7804 ,  Cell  =  D7-10 05/31/05
WCA2A Entire Gradient for 1978-2004    
Simulation Period 10/01/78 03/31/05 Use Geometric Mean Calibration      
Output Period: 10/01/78 03/31/05              
Calibration Period: 01/01/94 12/31/04              
Predicted Values for Calibration Period Calibration Set: PEW_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 38 cm K 34.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 14% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.6 cm/d C1 22 ppb Count 0 126 126 107 107 107
Mean P Load 427 mg/m2-yr C2 300 ppb Observed #N/A 4.9 0.39 8.0 8.0 8.4 1.00
Mean Flow/Width 132 m2/day Z1 40 cm Predicted #N/A 4.9 0.83 17.0 10.3 9.7 0.61
Hydraulic Resid Time 8 days Z2 100 cm Mean Resid #N/A 0.0 -0.44 -8.9 -2.2 -1.3 0.39
Inflow Conc 26 ppb Z3 400 cm Bias % #N/A 0% -53% -53% -22% -13% 65%
FWM Outflow Conc 17 ppb Avg Int 30 days Residual SE% #N/A #N/A 5% 56% 61% 61%
GeoMn Outflow Conc 11 ppb Area 30.258 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed