Calibration Charts Case = WCA2A_7804 ,  Cell  =  D4-7 05/31/05
WCA2A Entire Gradient for 1978-2004    
Simulation Period 10/01/78 03/31/05 Use Geometric Mean Calibration      
Output Period: 10/01/78 03/31/05              
Calibration Period: 01/01/94 12/31/04              
Predicted Values for Calibration Period Calibration Set: PEW_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 38 cm K 34.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 14% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.2 cm/d C1 22 ppb Count 0 114 114 103 103 103
Mean P Load 709 mg/m2-yr C2 300 ppb Observed #N/A 4.9 0.74 15.0 14.7 15.2 0.98
Mean Flow/Width 131 m2/day Z1 40 cm Predicted #N/A 4.9 1.24 25.2 16.0 14.6 0.64
Hydraulic Resid Time 9 days Z2 100 cm Mean Resid #N/A 0.0 -0.50 -10.2 -1.3 0.5 0.35
Inflow Conc 47 ppb Z3 400 cm Bias % #N/A 0% -40% -40% -8% 4% 54%
FWM Outflow Conc 26 ppb Avg Int 30 days Residual SE% #N/A #N/A 5% 58% 57% 57%
GeoMn Outflow Conc 17 ppb Area 32.918 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed