Calibration Charts Case = WCA2A_7804 ,  Cell  =  D10-13 05/31/05
WCA2A Entire Gradient for 1978-2004    
Simulation Period 10/01/78 03/31/05 Use Geometric Mean Calibration      
Output Period: 10/01/78 03/31/05              
Calibration Period: 01/01/94 12/31/04              
Predicted Values for Calibration Period Calibration Set: PEW_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 37 cm K 34.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 14% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 3.5 cm/d C1 22 ppb Count 0 126 126 105 105 105
Mean P Load 222 mg/m2-yr C2 300 ppb Observed #N/A 3.8 0.30 8.0 7.4 8.0 0.93
Mean Flow/Width 132 m2/day Z1 40 cm Predicted #N/A 3.8 0.46 12.1 7.5 7.5 0.62
Hydraulic Resid Time 11 days Z2 100 cm Mean Resid #N/A 0.0 -0.16 -4.2 -0.1 0.5 0.31
Inflow Conc 17 ppb Z3 400 cm Bias % #N/A 0% -35% -34% -2% 7% 50%
FWM Outflow Conc 12 ppb Avg Int 30 days Residual SE% #N/A #N/A 4% 50% 55% 55%
GeoMn Outflow Conc 8 ppb Area 39.463 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed