Calibration Charts Case = WCA2A_4 ,  Cell  =  WCA2A_4 05/31/05
WCA-2A  0 to 4.5 km South of L-29;       
Simulation Period 01/01/85 03/31/05              
Output Period: 01/01/94 03/31/05              
Calibration Period: 01/01/94 12/31/04              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 47 cm K 16.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 9% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 3.5 cm/d C1 22 ppb Count 0 111 111 102 102 102
Mean P Load 958 mg/m2-yr C2 300 ppb Observed #N/A 4.2 1.91 45.4 37.0 40.0 0.82
Mean Flow/Width 131 m2/day Z1 40 cm Predicted #N/A 4.2 1.93 46.0 32.6 32.1 0.71
Hydraulic Resid Time 13 days Z2 100 cm Mean Resid #N/A 0.0 -0.02 -0.7 4.4 7.9 0.11
Inflow Conc 75 ppb Z3 400 cm Bias % #N/A 0% -1% -1% 13% 24% 15%
FWM Outflow Conc 46 ppb Avg Int 30 days Residual SE% #N/A #N/A 35% 53% 48% 48%
GeoMn Outflow Conc 34 ppb Area 39.3 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed