Calibration Charts Case = STA6_C3 ,  Cell  =  C3 05/31/05
Cell 3 of STA 6            
Simulation Period 12/01/97 01/24/05 Outflows monitored separately after July 2000  
Output Period: 12/01/97 01/24/05              
Calibration Period: 07/01/00 01/24/05              
Predicted Values for Calibration Period Calibration Set: PEW_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 50 cm K 34.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 9% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 6.9 cm/d C1 22 ppb Count 57 49 49 48 48 48
Mean P Load 1805 mg/m2-yr C2 300 ppb Observed 50.3 5.6 1.31 23.5 19.0 18.6 0.81
Mean Flow/Width 69 m2/day Z1 40 cm Predicted 50.0 5.6 1.60 28.7 24.5 24.2 0.85
Hydraulic Resid Time 7 days Z2 100 cm Mean Resid 0.3 0.0 -0.28 -5.2 -5.5 -5.6 -0.04
Inflow Conc 71 ppb Z3 400 cm Bias % 1% 1% -18% -18% -22% -23% -5%
FWM Outflow Conc 29 ppb Avg Int 30 days Residual SE% 11% 46% 43% 97% 53% 53%
GeoMn Outflow Conc 25 ppb Area 0.99 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed