Calibration Charts Case = STA2_C3 ,  Cell  =  C3 05/31/05
STA2 - Cell 3          
Simulation Period 03/01/01 03/24/05              
Output Period: 03/01/01 03/24/05              
Calibration Period: 05/01/03 03/24/05              
Predicted Values for Calibration Period Calibration Set: SAV_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 87 cm K 52.5 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 5.1 cm/d C1 22 ppb Count 24 24 24 23 23 23
Mean P Load 2368 mg/m2-yr C2 300 ppb Observed 80.1 4.9 0.72 14.9 14.6 15.6 0.98
Mean Flow/Width 291 m2/day Z1 40 cm Predicted 87.4 5.0 1.04 20.8 14.3 12.3 0.69
Hydraulic Resid Time 17 days Z2 100 cm Mean Resid -7.3 -0.1 -0.31 -5.9 0.2 3.3 0.29
Inflow Conc 128 ppb Z3 400 cm Bias % -8% -2% -30% -29% 2% 27% 42%
FWM Outflow Conc 21 ppb Avg Int 30 days Residual SE% 26% 26% 24% 944% 52% 52%
GeoMn Outflow Conc 14 ppb Area 9.1911 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed