Calibration Charts Case = STA2_C2 ,  Cell  =  C2 05/31/05
STA2 - Cell 2          
Simulation Period 03/01/01 03/24/05              
Output Period: 03/01/01 03/24/05              
Calibration Period: 05/01/03 03/24/05              
Predicted Values for Calibration Period Calibration Set: PEW_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 66 cm K 34.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.8 cm/d C1 22 ppb Count 24 24 24 24 24 24
Mean P Load 1919 mg/m2-yr C2 300 ppb Observed 64.7 4.5 1.29 28.5 21.0 19.6 0.74
Mean Flow/Width 276 m2/day Z1 40 cm Predicted 65.9 4.7 1.44 30.8 18.7 15.4 0.61
Hydraulic Resid Time 14 days Z2 100 cm Mean Resid -1.2 -0.1 -0.15 -2.4 2.2 4.2 0.13
Inflow Conc 110 ppb Z3 400 cm Bias % -2% -3% -10% -8% 12% 28% 21%
FWM Outflow Conc 31 ppb Avg Int 30 days Residual SE% 21% 14% 14% 1885% 48% 48%
GeoMn Outflow Conc 19 ppb Area 9.1911 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed