Calibration Charts Case = STA2_C1 ,  Cell  =  C1 05/31/05
STA2 - Cell 1            
Simulation Period 03/01/01 03/24/05              
Output Period: 03/01/01 03/24/05              
Calibration Period: 05/01/03 03/24/05              
Predicted Values for Calibration Period Calibration Set: PEW_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 65 cm K 34.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 3.0 cm/d C1 22 ppb Count 24 24 24 23 23 23
Mean P Load 1094 mg/m2-yr C2 300 ppb Observed 66.2 2.6 0.29 11.5 11.8 12.7 1.02
Mean Flow/Width 136 m2/day Z1 40 cm Predicted 65.5 2.9 0.44 15.3 11.6 9.7 0.76
Hydraulic Resid Time 22 days Z2 100 cm Mean Resid 0.8 -0.3 -0.15 -3.7 0.1 2.9 0.26
Inflow Conc 100 ppb Z3 400 cm Bias % 1% -12% -33% -25% 1% 30% 34%
FWM Outflow Conc 15 ppb Avg Int 30 days Residual SE% 8% 27% 27% 109% 42% 42%
GeoMn Outflow Conc 12 ppb Area 7.2881 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed