Calibration Charts Case = STA1W_C5AB ,  Cell  =  C5B 05/31/05
STA1W - Cell 5 A & B        
Simulation Period 08/01/94 03/31/05 Excluding post-hurricane period      
Output Period: 01/01/00 03/31/05              
Calibration Period: 07/01/02 08/31/04              
Predicted Values for Calibration Period Calibration Set: SAV_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 67 cm K 52.5 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 9.4 cm/d C1 22 ppb Count 27 27 27 26 26 26
Mean P Load 5279 mg/m2-yr C2 300 ppb Observed 65.5 9.6 5.45 56.7 55.4 56.2 0.98
Mean Flow/Width 374 m2/day Z1 40 cm Predicted 67.2 8.8 4.89 55.5 50.0 48.9 0.90
Hydraulic Resid Time 7 days Z2 100 cm Mean Resid -1.7 0.8 0.56 1.2 5.5 7.3 0.08
Inflow Conc 153 ppb Z3 400 cm Bias % -3% 9% 11% 2% 11% 15% 9%
FWM Outflow Conc 56 ppb Avg Int 30 days Residual SE% 28% 49% 49% 277% 41% 41%
GeoMn Outflow Conc 50 ppb Area 9.279 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed