Calibration Charts Case = STA1W_C2 ,  Cell  =  C2 05/31/05
STA1W - Cell 2          
Simulation Period 08/01/94 03/31/05 G254 flows reduced by 20% after 2001 to close water budget (problems with UVM flow data)
Output Period: 01/01/00 03/31/05              
Calibration Period: 07/01/00 08/31/04              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 79 cm K 16.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 7.4 cm/d C1 22 ppb Count 51 51 51 51 51 51
Mean P Load 3828 mg/m2-yr C2 300 ppb Observed 78.6 6.7 7.55 113.3 88.1 86.1 0.78
Mean Flow/Width 281 m2/day Z1 40 cm Predicted 79.3 6.7 6.12 91.9 77.1 74.5 0.84
Hydraulic Resid Time 11 days Z2 100 cm Mean Resid -0.7 0.0 1.43 21.3 11.0 11.5 -0.06
Inflow Conc 142 ppb Z3 400 cm Bias % -1% 0% 23% 23% 14% 15% -7%
FWM Outflow Conc 92 ppb Avg Int 30 days Residual SE% 16% 40% 40% 88% 35% 35%
GeoMn Outflow Conc 77 ppb Area 3.81 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed