Calibration Charts Case = SAWGRASS ,  Cell  =  - 05/31/05
Sawgrass Lake - SJWMCA      
Simulation Period 03/01/96 09/30/99 compiled by WSI          
Output Period: 03/01/96 09/30/99 short HRT          
Calibration Period: 03/01/97 09/30/99              
Predicted Values for Calibration Period Calibration Set: RES_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 134 cm K 5.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 52.6 cm/d C1 150 ppb Count 32 32 32 32 32 32
Mean P Load 27487 mg/m2-yr C2 0 ppb Observed 158.0 52.5 64.93 123.8 136.3 133.2 1.10
Mean Flow/Width 1061 m2/day Z1 40 cm Predicted 133.5 52.5 72.68 138.5 149.8 148.1 1.08
Hydraulic Resid Time 3 days Z2 100 cm Mean Resid 24.5 0.0 -7.75 -14.8 -13.6 -14.8 0.02
Inflow Conc 143 ppb Z3 400 cm Bias % 18% 0% -11% -11% -9% -10% 2%
FWM Outflow Conc 139 ppb Avg Int 30 days Residual SE% 19% #N/A 0% 26% 26% 26%
GeoMn Outflow Conc 150 ppb Area 1.95 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed