Calibration Charts Case = PSTC_8 ,  Cell  =  C8 05/31/05
PSTA ENRP South Test Cell 8      
Simulation Period 02/23/99 01/26/05 Shellrock          
Output Period: 02/23/99 01/26/05 SFWMD monitoring started in March 2002    
Calibration Period: 03/01/02 01/26/05              
Predicted Values for Calibration Period Calibration Set: PSTA_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 47 cm K 23.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 3.0 cm/d C1 22 ppb Count 0 34 34 34 34 34
Mean P Load 570 mg/m2-yr C2 300 ppb Observed #N/A 2.9 0.38 12.9 12.4 12.4 0.96
Mean Flow/Width 3 m2/day Z1 0 cm Predicted #N/A 2.9 0.36 12.2 12.0 12.0 0.99
Hydraulic Resid Time 16 days Z2 100 cm Mean Resid #N/A 0.0 0.02 0.7 0.4 0.5 -0.03
Inflow Conc 52 ppb Z3 400 cm Bias % #N/A 0% 6% 6% 3% 4% -3%
FWM Outflow Conc 12 ppb Avg Int 30 days Residual SE% #N/A #N/A 0% 27% 27% 27%
GeoMn Outflow Conc 12 ppb Area 0.0022 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed