Calibration Charts Case = PSTC_3 ,  Cell  =  C3 05/31/05
PSTA ENRP South Test Cell 3      
Simulation Period 02/23/99 01/26/05 SFWMD monitoring started March 2002    
Output Period: 02/23/99 01/26/05              
Calibration Period: 05/01/02 01/26/05              
Predicted Values for Calibration Period Calibration Set: PSTA_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 52 cm K 23.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 2.8 cm/d C1 22 ppb Count 0 32 32 32 32 32
Mean P Load 569 mg/m2-yr C2 300 ppb Observed #N/A 2.7 0.37 13.6 13.3 13.2 0.97
Mean Flow/Width 3 m2/day Z1 0 cm Predicted #N/A 2.7 0.30 10.9 10.9 10.8 0.99
Hydraulic Resid Time 19 days Z2 100 cm Mean Resid #N/A 0.0 0.07 2.7 2.4 2.4 -0.02
Inflow Conc 56 ppb Z3 400 cm Bias % #N/A 0% 25% 25% 22% 22% -2%
FWM Outflow Conc 11 ppb Avg Int 30 days Residual SE% #N/A #N/A 0% 30% 30% 30%
GeoMn Outflow Conc 11 ppb Area 0.0022 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed