Calibration Charts Case = PSTA_FS3W ,  Cell  =  C3 05/31/05
PSTA Field Scale Cell 3        
Simulation Period 09/06/00 04/03/03 scraped to caprock        
Output Period: 07/01/01 04/03/03 with inflow & outflow seepage      
Calibration Period: 08/01/02 04/03/03              
Predicted Values for Calibration Period Calibration Set: PSTA_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 35 cm K 23.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 11.4 cm/d C1 22 ppb Count 36 36 36 36 36 36
Mean P Load 1168 mg/m2-yr C2 300 ppb Observed 35.9 12.7 1.90 15.0 14.6 14.6 0.97
Mean Flow/Width 33 m2/day Z1 0 cm Predicted 35.4 10.7 1.70 15.9 14.2 13.9 0.89
Hydraulic Resid Time 3 days Z2 100 cm Mean Resid 0.5 2.0 0.20 -0.9 0.4 0.7 0.08
Inflow Conc 28 ppb Z3 400 cm Bias % 1% 18% 12% -6% 3% 5% 9%
FWM Outflow Conc 16 ppb Avg Int 7 days Residual SE% 10% 47% 42% 88% 28% 28%
GeoMn Outflow Conc 14 ppb Area 0.0194 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed