Calibration Charts Case = PSTA_FS2W ,  Cell  =  C2 05/31/05
PSTA Field Scale Cell 2        
Simulation Period 09/06/00 04/03/03 Limerock, Sinuous        
Output Period: 07/01/01 04/03/03              
Calibration Period: 08/01/02 04/03/03              
Predicted Values for Calibration Period Calibration Set: PSTA_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 29 cm K 23.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 3% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 14.6 cm/d C1 22 ppb Count 35 36 36 36 36 36
Mean P Load 1447 mg/m2-yr C2 300 ppb Observed 30.0 8.9 1.08 12.2 12.1 12.0 0.99
Mean Flow/Width 132 m2/day Z1 0 cm Predicted 28.7 8.6 1.38 16.0 14.3 13.7 0.89
Hydraulic Resid Time 2 days Z2 100 cm Mean Resid 1.3 0.3 -0.29 -3.8 -2.2 -1.6 0.10
Inflow Conc 27 ppb Z3 400 cm Bias % 4% 3% -21% -24% -16% -12% 11%
FWM Outflow Conc 16 ppb Avg Int 7 days Residual SE% 18% 47% 41% 97% 42% 42%
GeoMn Outflow Conc 14 ppb Area 0.02 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed