Calibration Charts Case = OKEE_9599 ,  Cell  =  - 05/31/05
observed concentrations in open lake    
Simulation Period 01/01/89 12/31/99              
Output Period: 01/01/92 12/31/99              
Calibration Period: 01/01/95 12/31/99              
Predicted Values for Calibration Period Calibration Set: RES_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 287 cm K 5.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 0.5 cm/d C1 150 ppb Count 0 21 21 21 21 21
Mean P Load 295 mg/m2-yr C2 0 ppb Observed #N/A 0.4 0.55 128.4 113.7 105.6 0.89
Mean Flow/Width 206 m2/day Z1 40 cm Predicted #N/A 0.4 0.32 75.5 72.7 72.6 0.96
Hydraulic Resid Time 578 days Z2 100 cm Mean Resid #N/A 0.0 0.22 52.9 41.0 33.0 -0.08
Inflow Conc 163 ppb Z3 400 cm Bias % #N/A 0% 69% 70% 56% 45% -8%
FWM Outflow Conc 76 ppb Avg Int 90 days Residual SE% #N/A 32% 32% 101% 52% 52%
GeoMn Outflow Conc 73 ppb Area 1732 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed