Calibration Charts Case = OKEE_7599 ,  Cell  =  - 05/31/05
observed concentrations in open lake    
Simulation Period 11/01/72 12/31/99 simulation possibly affected by initial condition  
Output Period: 01/01/73 12/31/99              
Calibration Period: 01/01/75 12/31/99              
Predicted Values for Calibration Period Calibration Set: RES_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 267 cm K 5.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 0.4 cm/d C1 150 ppb Count 0 102 102 102 102 102
Mean P Load 263 mg/m2-yr C2 0 ppb Observed #N/A 0.3 0.28 105.4 87.3 83.5 0.83
Mean Flow/Width 165 m2/day Z1 40 cm Predicted #N/A 0.3 0.21 79.4 77.7 77.3 0.98
Hydraulic Resid Time 674 days Z2 100 cm Mean Resid #N/A 0.0 0.07 26.0 9.6 6.2 -0.15
Inflow Conc 182 ppb Z3 400 cm Bias % #N/A 0% 33% 33% 12% 8% -15%
FWM Outflow Conc 79 ppb Avg Int 90 days Residual SE% #N/A 57% 57% 117% 41% 41%
GeoMn Outflow Conc 78 ppb Area 1732 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed