Calibration Charts Case = Lakeland ,  Cell  =  Lakeland_TMT 05/31/05
High inlet P ~6000 ppb; clay soils; built on phosphate mine;
Simulation Period 01/01/93 09/30/99  poor hydraulics; used 10 iterations to stabilize biomass P
Output Period: 01/01/93 09/30/99 Qunits:            
Calibration Period: 06/01/96 09/30/99              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 115 cm K 16.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 0.7 cm/d C1 22 ppb Count 42 42 42 42 42 42
Mean P Load 12755 mg/m2-yr C2 300 ppb Observed 115.8 0.6 18.29 2907.9 2981.4 2972.2 1.03
Mean Flow/Width 18 m2/day Z1 40 cm Predicted 114.6 0.7 22.63 3020.8 2954.0 2994.0 0.98
Hydraulic Resid Time 154 days Z2 100 cm Mean Resid 1.3 -0.1 -4.35 -112.9 27.5 -21.8 0.05
Inflow Conc 4696 ppb Z3 400 cm Bias % 1% -16% -19% -4% 1% -1% 5%
FWM Outflow Conc 3021 ppb Avg Int 30 days Residual SE% 2% 47% 47% 92% 35% 35%
GeoMn Outflow Conc 2954 ppb Area 4.8142 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed