Calibration Charts Case = ISTOK_2 ,  Cell  =  - 05/31/05
compiled by burns & mcdonnell      
Simulation Period 01/01/89 12/31/02              
Output Period: 01/01/89 12/31/02              
Calibration Period: 01/01/90 12/31/02              
Predicted Values for Calibration Period Calibration Set: RES_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 158 cm K 5.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 0.9 cm/d C1 150 ppb Count 53 53 53 51 51 51
Mean P Load 377 mg/m2-yr C2 0 ppb Observed 160.7 0.8 0.44 54.0 42.1 41.1 0.78
Mean Flow/Width 107 m2/day Z1 40 cm Predicted 158.0 0.8 0.45 57.2 52.2 51.4 0.91
Hydraulic Resid Time 178 days Z2 100 cm Mean Resid 2.7 0.0 -0.01 -3.2 -10.0 -10.3 -0.13
Inflow Conc 116 ppb Z3 400 cm Bias % 2% 4% -2% -6% -19% -20% -14%
FWM Outflow Conc 57 ppb Avg Int 90 days Residual SE% 8% 42% 42% 168% 46% 46%
GeoMn Outflow Conc 52 ppb Area 112.05 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed