Calibration Charts Case = IronBridge ,  Cell  =  Marsh 05/31/05
Orlando Easterly Wetlands / Iron Bridge; 1989-1997  
Simulation Period 07/01/83 12/31/97 multi-cell treatment wetlands;  deep & shallow cells  
Output Period: 07/01/88 12/31/97 excluding terminal lake        
Calibration Period: 07/01/88 12/31/97              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 70 cm K 16.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 1.1 cm/d C1 22 ppb Count 116 116 116 115 115 115
Mean P Load 1101 mg/m2-yr C2 300 ppb Observed 70.2 1.0 0.60 60.1 55.4 50.6 0.92
Mean Flow/Width 26 m2/day Z1 40 cm Predicted 70.4 1.1 0.61 56.7 54.5 54.4 0.96
Hydraulic Resid Time 66 days Z2 100 cm Mean Resid -0.2 -0.1 -0.02 3.5 0.9 -3.8 -0.04
Inflow Conc 283 ppb Z3 400 cm Bias % 0% -8% -2% 6% 2% -7% -4%
FWM Outflow Conc 57 ppb Avg Int 30 days Residual SE% 0% 29% 29% 49% 24% 24%
GeoMn Outflow Conc 54 ppb Area 4.8182 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed