Calibration Charts Case = HELLNBLAZES ,  Cell  =  - 05/31/05
inflow conc data prior to 3/1996      
Simulation Period 01/01/95 09/30/99 short HRT          
Output Period: 03/01/96 09/30/99              
Calibration Period: 01/01/97 09/30/99              
Predicted Values for Calibration Period Calibration Set: RES_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 126 cm K 5.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 63.2 cm/d C1 150 ppb Count 34 34 34 34 34 34
Mean P Load 36399 mg/m2-yr C2 0 ppb Observed 144.8 63.1 91.33 144.7 168.6 166.5 1.17
Mean Flow/Width 1951 m2/day Z1 40 cm Predicted 126.1 63.1 97.22 154.0 165.2 163.8 1.07
Hydraulic Resid Time 2 days Z2 100 cm Mean Resid 18.7 0.0 -5.89 -9.3 3.4 2.7 0.09
Inflow Conc 158 ppb Z3 400 cm Bias % 15% 0% -6% -6% 2% 2% 9%
FWM Outflow Conc 154 ppb Avg Int 30 days Residual SE% 19% #N/A 0% 30% 30% 30%
GeoMn Outflow Conc 165 ppb Area 1.54 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed