Calibration Charts Case = HARNEY_2 ,  Cell  =  - 05/31/05
compiled by WSI          
Simulation Period 01/01/89 12/31/98              
Output Period: 01/01/89 12/31/98              
Calibration Period: 01/01/90 12/31/98              
Predicted Values for Calibration Period Calibration Set: RES_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 204 cm K 5.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 22.1 cm/d C1 150 ppb Count 110 110 110 110 110 110
Mean P Load 3930 mg/m2-yr C2 0 ppb Observed 201.1 22.2 11.28 50.8 49.4 49.3 0.97
Mean Flow/Width 1533 m2/day Z1 40 cm Predicted 204.2 22.2 10.40 46.9 44.7 44.6 0.95
Hydraulic Resid Time 9 days Z2 100 cm Mean Resid -3.2 0.0 0.87 3.9 4.7 4.7 0.02
Inflow Conc 49 ppb Z3 400 cm Bias % -2% 0% 8% 8% 11% 10% 2%
FWM Outflow Conc 47 ppb Avg Int 30 days Residual SE% 6% #N/A 0% 30% 30% 30%
GeoMn Outflow Conc 45 ppb Area 24.52 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed