Calibration Charts Case = GEORGE ,  Cell  =  - 05/31/05
mainstem st john's river; tp excursion 2001-2003 unexplained
Simulation Period 02/20/94 09/30/03 missing inflow data jan-july 2001      
Output Period: 02/20/94 09/30/03              
Calibration Period: 02/20/95 12/31/00              
Predicted Values for Calibration Period Calibration Set: RES_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 341 cm K 5.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.7 cm/d C1 150 ppb Count 72 72 72 72 72 72
Mean P Load 949 mg/m2-yr C2 0 ppb Observed 347.9 4.6 3.05 66.0 61.3 61.8 0.93
Mean Flow/Width 961 m2/day Z1 40 cm Predicted 341.3 4.8 2.56 53.9 53.2 53.2 0.99
Hydraulic Resid Time 73 days Z2 100 cm Mean Resid 6.6 -0.1 0.49 12.0 8.1 8.6 -0.06
Inflow Conc 56 ppb Z3 400 cm Bias % 2% -3% 19% 22% 15% 16% -6%
FWM Outflow Conc 54 ppb Avg Int 30 days Residual SE% 4% 24% 24% 48% 26% 26%
GeoMn Outflow Conc 53 ppb Area 186.25 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed