Calibration Charts Case = ENRP_C3 ,  Cell  =  C3 05/31/05
ENRP Cell 3          
Simulation Period 08/01/94 12/31/98 Prior to STA1W construction      
Output Period: 08/01/94 12/31/98 Inflows include measured seepage return    
Calibration Period: 01/01/97 12/31/98              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 35 cm K 16.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 2.7 cm/d C1 22 ppb Count 25 25 25 25 25 25
Mean P Load 382 mg/m2-yr C2 300 ppb Observed 30.4 3.0 0.62 20.7 19.3 19.2 0.93
Mean Flow/Width 83 m2/day Z1 40 cm Predicted 35.3 2.5 0.46 18.7 18.8 18.9 1.01
Hydraulic Resid Time 13 days Z2 100 cm Mean Resid -5.0 0.5 0.16 2.1 0.5 0.3 -0.07
Inflow Conc 39 ppb Z3 400 cm Bias % -14% 21% 34% 11% 3% 1% -7%
FWM Outflow Conc 19 ppb Avg Int 30 days Residual SE% 25% 31% 31% 49% 24% 24%
GeoMn Outflow Conc 19 ppb Area 4.15 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed