Calibration Charts Case = ENRP_C2 ,  Cell  =  C2 05/31/05
ENRP Cell 2          
Simulation Period 08/01/94 12/31/98 Prior to STA1W construction      
Output Period: 08/01/94 12/31/98              
Calibration Period: 01/01/97 12/31/98              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 76 cm K 16.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 5.4 cm/d C1 22 ppb Count 25 25 25 25 25 25
Mean P Load 1328 mg/m2-yr C2 300 ppb Observed 74.2 4.8 1.72 35.6 34.4 34.3 0.97
Mean Flow/Width 204 m2/day Z1 40 cm Predicted 76.4 4.8 1.97 41.1 40.8 40.4 0.99
Hydraulic Resid Time 14 days Z2 100 cm Mean Resid -2.2 0.0 -0.26 -5.5 -6.4 -6.1 -0.02
Inflow Conc 68 ppb Z3 400 cm Bias % -3% 1% -13% -13% -16% -15% -3%
FWM Outflow Conc 41 ppb Avg Int 30 days Residual SE% 9% 11% 11% 32% 30% 30%
GeoMn Outflow Conc 41 ppb Area 3.81 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed