Calibration Charts Case = C111_EAST ,  Cell  =  Marsh 05/31/05
C111 - Periphyton Area - East Transect - Inflow from E1/W1
Simulation Period 01/01/95 12/31/00              
Output Period: 01/01/97 12/31/00              
Calibration Period: 09/01/98 12/31/00              
Predicted Values for Calibration Period Calibration Set: PSTA_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 13 cm K 23.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 38% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 8.8 cm/d C1 22 ppb Count 16 19 19 19 19 19
Mean P Load 230 mg/m2-yr C2 300 ppb Observed 7.8 12.9 0.92 7.2 5.4 5.2 0.75
Mean Flow/Width 53 m2/day Z1 0 cm Predicted 11.7 12.1 0.81 6.7 5.6 5.3 0.84
Hydraulic Resid Time 1 days Z2 100 cm Mean Resid -3.9 0.8 0.12 0.5 -0.2 -0.2 -0.09
Inflow Conc 7 ppb Z3 400 cm Bias % -33% 6% 15% 8% -4% -3% -11%
FWM Outflow Conc 7 ppb Avg Int 30 days Residual SE% 60% #N/A 19% 68% 41% 41%
GeoMn Outflow Conc 5 ppb Area 3.7576 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed