Calibration Charts Case = BoneyMarsh ,  Cell  =  Marsh 05/31/05
Boney Marsh          
Simulation Period 03/27/76 12/31/85              
Output Period: 04/01/79 12/31/85              
Calibration Period: 01/01/82 12/31/85              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 46 cm K 16.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 2.0 cm/d C1 22 ppb Count 0 50 50 50 50 50
Mean P Load 420 mg/m2-yr C2 300 ppb Observed #N/A 2.0 0.40 19.5 19.0 18.9 0.97
Mean Flow/Width 32 m2/day Z1 40 cm Predicted #N/A 1.9 0.31 15.9 16.3 16.3 1.03
Hydraulic Resid Time 23 days Z2 100 cm Mean Resid #N/A 0.1 0.09 3.7 2.7 2.7 -0.05
Inflow Conc 58 ppb Z3 400 cm Bias % #N/A 6% 30% 23% 17% 16% -5%
FWM Outflow Conc 16 ppb Avg Int 30 days Residual SE% #N/A 20% 20% 65% 42% 42%
GeoMn Outflow Conc 16 ppb Area 0.4859 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed