Calibration Charts Case = WCA2A_7 ,  Cell  =  WCA2A_7 05/31/05
WCA-2A  6.9 km South of L-29      
Simulation Period 01/01/85 03/31/05              
Output Period: 01/01/94 03/31/05              
Calibration Period: 01/01/94 12/31/04              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 38 cm K 25.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 13% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 1.9 cm/d C1 22 ppb Count 0 115 115 106 106 106
Mean P Load 521 mg/m2-yr C2 300 ppb Observed #N/A 2.3 0.35 15.3 14.8 15.1 0.97
Mean Flow/Width 131 m2/day Z1 40 cm Predicted #N/A 2.2 0.57 25.3 16.5 16.1 0.65
Hydraulic Resid Time 20 days Z2 0 cm Mean Resid #N/A 0.0 -0.22 -10.0 -1.6 -1.0 0.32
Inflow Conc 75 ppb Z3 0 cm Bias % #N/A 1% -39% -39% -10% -6% 49%
FWM Outflow Conc 26 ppb Avg Int 30 days Residual SE% #N/A #N/A 8% 56% 55% 55%
GeoMn Outflow Conc 17 ppb Area 72.3 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed