Calibration Charts Case = WCA2A_10 ,  Cell  =  WCA2A_10 05/31/05
WCA-2A  10 km South of L-29      
Simulation Period 01/01/85 03/31/05              
Output Period: 01/01/94 03/31/05              
Calibration Period: 01/01/94 12/31/04              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 38 cm K 34.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 13% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 1.3 cm/d C1 22 ppb Count 0 125 125 108 108 108
Mean P Load 368 mg/m2-yr C2 300 ppb Observed #N/A 1.5 0.12 8.1 8.0 8.5 0.99
Mean Flow/Width 131 m2/day Z1 40 cm Predicted #N/A 1.5 0.22 15.4 8.8 8.9 0.57
Hydraulic Resid Time 28 days Z2 0 cm Mean Resid #N/A 0.0 -0.11 -7.3 -0.8 -0.4 0.42
Inflow Conc 75 ppb Z3 0 cm Bias % #N/A 1% -47% -47% -9% -4% 73%
FWM Outflow Conc 16 ppb Avg Int 30 days Residual SE% #N/A #N/A 7% 55% 59% 59%
GeoMn Outflow Conc 9 ppb Area 102.4 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed