Calibration Charts Case = STA6_C5 ,  Cell  =  C5 05/31/05
Cell 5 of STA 6          
Simulation Period 12/01/97 01/20/05 Outflow monitored separated after july 2000    
Output Period: 12/01/97 01/20/05              
Calibration Period: 07/01/00 01/20/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 50 cm K 34.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 4% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 3.4 cm/d C1 22 ppb Count 56 47 47 46 46 46
Mean P Load 972 mg/m2-yr C2 300 ppb Observed 47.2 3.1 0.61 19.8 16.5 16.7 0.83
Mean Flow/Width 71 m2/day Z1 40 cm Predicted 49.8 2.7 0.59 21.9 16.7 16.2 0.76
Hydraulic Resid Time 15 days Z2 0 cm Mean Resid -2.7 0.4 0.02 -2.2 -0.2 0.4 0.07
Inflow Conc 79 ppb Z3 0 cm Bias % -5% 14% 3% -10% -1% 3% 10%
FWM Outflow Conc 22 ppb Avg Int 30 days Residual SE% 12% 52% 54% 93% 46% 46%
GeoMn Outflow Conc 16 ppb Area 2.5306 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed