Calibration Charts Case = STA6_C3 ,  Cell  =  C3 05/31/05
Cell 3 of STA 6            
Simulation Period 12/01/97 01/24/05 Outflows monitored separately after July 2000  
Output Period: 12/01/97 01/24/05              
Calibration Period: 07/01/00 01/24/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 50 cm K 48.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 9% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 6.9 cm/d C1 22 ppb Count 57 49 49 48 48 48
Mean P Load 1805 mg/m2-yr C2 300 ppb Observed 50.3 5.6 1.31 23.5 19.0 18.6 0.81
Mean Flow/Width 69 m2/day Z1 40 cm Predicted 50.0 5.6 1.28 23.1 19.6 18.9 0.85
Hydraulic Resid Time 7 days Z2 0 cm Mean Resid 0.3 0.0 0.03 0.4 -0.5 -0.4 -0.04
Inflow Conc 71 ppb Z3 0 cm Bias % 1% 1% 2% 2% -3% -2% -5%
FWM Outflow Conc 23 ppb Avg Int 30 days Residual SE% 11% 46% 43% 95% 48% 48%
GeoMn Outflow Conc 20 ppb Area 0.99 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed