Calibration Charts Case = STA6_ALL ,  Cell  =  ALL 05/31/05
STA6 Cells 3 & 5 Combined; driven gy G600    
Simulation Period 12/01/97 01/24/05              
Output Period: 12/01/97 01/24/05              
Calibration Period: 07/01/00 01/24/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 48 cm K 42.2 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 11% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.8 cm/d C1 22 ppb Count 57 49 49 48 48 48
Mean P Load 1436 mg/m2-yr C2 300 ppb Observed 48.0 3.7 0.78 21.3 18.1 18.5 0.85
Mean Flow/Width 90 m2/day Z1 40 cm Predicted 47.6 3.2 0.77 24.1 18.3 17.3 0.76
Hydraulic Resid Time 10 days Z2 0 cm Mean Resid 0.5 0.5 0.02 -2.8 -0.3 1.2 0.09
Inflow Conc 82 ppb Z3 0 cm Bias % 1% 15% 2% -11% -1% 7% 11%
FWM Outflow Conc 24 ppb Avg Int 30 days Residual SE% 9% 34% 38% 84% 43% 43%
GeoMn Outflow Conc 18 ppb Area 3.5206 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed