Calibration Charts Case = STA5_All ,  Cell  =  STA5_All 05/31/05
STA5 Cells lumped simulation      
Simulation Period 06/01/99 02/28/05 Inflows ignore seepage recycle      
Output Period: 06/01/99 02/28/05              
Calibration Period: 09/01/03 02/28/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 39 cm K 22.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 5% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 2.5 cm/d C1 22 ppb Count 19 19 19 19 19 19
Mean P Load 1914 mg/m2-yr C2 300 ppb Observed 46.6 2.5 5.24 212.1 107.0 103.0 0.50
Mean Flow/Width 148 m2/day Z1 40 cm Predicted 38.6 2.1 1.74 81.5 120.9 139.8 1.48
Hydraulic Resid Time 16 days Z2 0 cm Mean Resid 8.0 0.3 3.51 130.6 -13.8 -36.8 -0.98
Inflow Conc 212 ppb Z3 0 cm Bias % 21% 16% 202% 160% -11% -26% -66%
FWM Outflow Conc 82 ppb Avg Int 30 days Residual SE% 48% 23% 23% 1372% 124% 124%
GeoMn Outflow Conc 121 ppb Area 16.64 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed