Calibration Charts Case = STA5 ,  Cell  =  1B 05/31/05
STA5 Cells in parallel        
Simulation Period 06/01/99 02/28/05 Inflows ignore seepage recycle      
Output Period: 06/01/99 02/28/05              
Calibration Period: 09/01/03 02/28/05              
Predicted Values for Calibration Period Calibration Set: EMG_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 46 cm K 16.9 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 5% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 3.9 cm/d C1 22 ppb Count 19 19 19 19 19 19
Mean P Load 2468 mg/m2-yr C2 300 ppb Observed 52.4 5.9 4.22 71.5 72.9 71.1 1.02
Mean Flow/Width 124 m2/day Z1 40 cm Predicted 45.9 3.6 3.36 94.1 88.1 125.1 0.94
Hydraulic Resid Time 12 days Z2 100 cm Mean Resid 6.5 2.3 0.86 -22.6 -15.2 -54.0 0.08
Inflow Conc 172 ppb Z3 400 cm Bias % 14% 65% 25% -24% -17% -43% 9%
FWM Outflow Conc 94 ppb Avg Int 30 days Residual SE% 55% 102% 102% 148% 36% 36%
GeoMn Outflow Conc 88 ppb Area 4.937 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed