Calibration Charts Case = STA2_C2 ,  Cell  =  C2 05/31/05
STA2 - Cell 2          
Simulation Period 03/01/01 03/24/05              
Output Period: 03/01/01 03/24/05              
Calibration Period: 05/01/03 03/24/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 66 cm K 28.6 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.8 cm/d C1 22 ppb Count 24 24 24 24 24 24
Mean P Load 1919 mg/m2-yr C2 300 ppb Observed 64.7 4.5 1.29 28.5 21.0 19.6 0.74
Mean Flow/Width 276 m2/day Z1 40 cm Predicted 65.9 4.7 1.64 35.2 22.0 18.3 0.63
Hydraulic Resid Time 14 days Z2 0 cm Mean Resid -1.2 -0.1 -0.35 -6.8 -1.1 1.3 0.11
Inflow Conc 110 ppb Z3 0 cm Bias % -2% -3% -22% -19% -5% 7% 18%
FWM Outflow Conc 35 ppb Avg Int 30 days Residual SE% 21% 14% 14% 1875% 45% 45%
GeoMn Outflow Conc 22 ppb Area 9.1911 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed