Calibration Charts Case = STA2_All ,  Cell  =  ALL 05/31/05
STA2 lumped simulation        
Simulation Period 03/01/01 03/24/05 Inflows  = S6 + G328        
Output Period: 03/01/01 03/24/05              
Calibration Period: 05/01/03 03/24/05              
Predicted Values for Calibration Period Calibration Set: none Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 72 cm K 36.0 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 0% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.4 cm/d C1 22 ppb Count 24 24 24 24 24 24
Mean P Load 1586 mg/m2-yr C2 300 ppb Observed 70.4 4.7 0.77 16.4 13.6 12.9 0.83
Mean Flow/Width 237 m2/day Z1 40 cm Predicted 72.2 4.3 0.92 21.3 14.3 12.8 0.67
Hydraulic Resid Time 16 days Z2 0 cm Mean Resid -1.9 0.4 -0.15 -4.9 -0.7 0.1 0.16
Inflow Conc 98 ppb Z3 0 cm Bias % -3% 8% -17% -23% -5% 1% 23%
FWM Outflow Conc 21 ppb Avg Int 30 days Residual SE% 21% 27% 27% 68% 36% 36%
GeoMn Outflow Conc 14 ppb Area 25.76 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed